|
CSE Home |
About Us |
Search |
Contact Info |
May 3 2003: Atrium, hallway, t-shirt in action
April 2003: Lunch and t-shirts for the construction crew (and a few Vice Presidents)
November 2002: The atrium -- staircase structure; aerial view
(Aerial view by Soundview Aerial Photography)
October 11 2002:
"Topping
Out" of the Paul G. Allen Center for
Computer Science & Engineering -- placement of the final
structural beam
September 2002: A 15-photo "building tour." Concrete work was
completed at the
end of August. Structural steel will be completed
by early October.
July 2002: Regent William H. Gates with Mortenson's Rick
Philipovich; donor Ben Slivka
on the newly-poured 6th floor with Ed Lazowska and Rick Philipovich
Donors Melissa and Kirk Glerum on the 4th floor
(two more floors to go!), joined by
Ed Lazowska and Bob Dillon
The Microsoft Atrium, a 6-story glass-roofed
student commons
connecting the Paul G. Allen Center (left) to
the EE Building (right)
|
Computer Science & Engineering University of Washington Box 352350 Seattle, WA 98195-2350 (206) 543-1695 voice, (206) 543-2969 FAX [comments to lazowska at cs.washington.edu] | |